DEVELOPMENT OF A POWER MANAGEMENT ALGORITHM FOR ELECTRICAL
POWER NETWORK
ABSTRACT
This project work is aimed at developing an efficient
Algorithm for the management of Electric Power network using fuzzy logic. The
fuzzy logic model functions as a system operator in making decision for load
shedding and transfer switching. The new technique uses the system data
frequency variation, load variation and voltage variation and the experience of
the system operators to formulate fuzzy rules, which are then simulated using
fuzzy logic toolbox in
MATLAB.
The fuzzy controller for the load shedding management of
power system, was modeled and developed. Data collected from the New Haven
Electric Power Distribution Substation was used to formulate the fuzzy logic
interference rules. Simulation results indicates a remarkable improvement in
the performance of the load shedding management at the power plants. Using the
fuzzy controller the delay in load shedding transfer switching was reduced from
600 s to 0.02316 s, representing 99.99% reduction in load shedding transfer
switching. The fuzzy logic controller achieved a power management efficiency of
90.57%.
CHAPTER ONE
INTRODUCTION
1.1
Background of the Study
Future development and present operation of electric power
system along
with other large system must pursue a number of different goals.
Above all, the power system should be economically efficient, if it should
provide reliable energy supply and should not have any detrimental impact on
the environment. In addition to these global goals there is a number of
supplementary goals, objectives and criteria. At the same time, operation and
development of the system network is influenced by a variety of uncertain and
random factors. As a result, the development strategy can be chosen from a
large number of possible alternatives. Obviously, among a set of possible
alternatives the developer attempts to find the best, or in accordance with
accepted term, the optimal alternative. Thus, the complexity of the problem
related to power systems planning is mainly caused by presence of multiple objectives,
uncertain information and large number of variables.
In this research work, effort is devoted to consideration of
the methods for development management of electric power network.
HOW TO RECEIVE PROJECT
MATERIAL(S)
After
paying the appropriate amount (#5,000) into our bank Account below, send the
following information to
08068231953
or 08168759420
(1) Your project topics
(2) Email Address
(3) Payment Name
(4) Teller Number
We will send your material(s) after we receive bank alert
BANK
ACCOUNTS
Account Name: AMUTAH DANIEL CHUKWUDI
Account Number: 0046579864
Bank: GTBank.
OR
Account Name: AMUTAH DANIEL CHUKWUDI
Account Number: 3139283609
Bank: FIRST BANK
FOR
MORE INFORMATION, CALL:
08068231953
or 08168759420
https://projectmaterialsng.blogspot.com.ng/
https://foreasyprojectmaterials.blogspot.com.ng/
https://myeasymaterials.blogspot.com.ng/
https://eazyprojectsmaterial.blogspot.com.ng/
https://easzprojectmaterial.blogspot.com.ng/
Comments
Post a Comment